Westside Regional Medical Center
Various AHU’s Replacements
Location: Plantation, Florida
The project required the demolition of existing equipment, ductwork, piping, and electrical services. Included the installation of (5) AHUs and modified existing supply air, return air, outside air, relief air ductwork, and all appurtenances. The scope also required the installation of a new pump enclosure.